Build and install Data Center or Server Room systems
Installation and build for Data Center / Server Room / Network Room / Communication with equipment supply. Layout considers room size, equipment placement, and space for supporting systems.
Request consultation Scope
- Build and renovate Data Center / Server Room / Network Room / Communication Room
- Exterior walls fire-resistant for at least 1 hour, and at least 4 hours for Rated 4
- Separate entrance for support systems such as cooling and backup power
- Raised floor with uniform load support, anti-static performance, floor-load checks, ramp and height calculation
- Share-load bases where the existing floor needs additional capacity
- Heat-insulating walls / ISO Wall / Sandwich Panel to size and budget
- Ceiling height and clearance to fire discharge points not below standard
Deliverables
- Completed build or renovation within agreed scope
- Raised floor, fire/thermal wall works, and share-load bases when included
- Isowall project assessment with preliminary design
- Room ready for power, cooling, fire, and security installation
Related services
Design Data Center or Server Room systems end to end
Design and renovate Data Center and Server Room systems to international standards. Free consultation on every design approach—with focus on stability, availability, maintainability, safety, investment fit, and future expansion.
Complete electrical design, installation, and backup power
Design, install, improve, and provide after-sales service for internal electrical and backup power systems in Data Centers and Server Rooms that run 24 hours a day.
Cooling System installation for Data Center
Design, install, and calculate air conditioning for Data Center or Server Room—including Precision Air / CRAC, Cold Aisle Containment, and Air Sequence Control Unit (ASCU).
FAQ
Why separate the support-system entrance?
So cooling and backup-power areas can be serviced without using the main Server Room entrance.
What does a raised floor improve?
Cable routing under the floor, anti-static protection, stability, and suitable load support for IT equipment.
When is ISO Wall used?
When the project needs insulating walls for temperature control, such as cold-room style partitions, sized to the customer budget.