Complete electrical design, installation, and backup power

Design, install, improve, and provide after-sales service for internal electrical and backup power systems in Data Centers and Server Rooms that run 24 hours a day.

Power distribution equipment inside a server room Request consultation

Scope

  • Design and installation of electrical systems for Data Center and Server Room
  • Electrical design, calculation, and drawings
  • Building electrical works related to the room
  • Electrical inspection and certification by an electrical engineer
  • Main power source, backup power, and supply to equipment
  • Power cabling, UPS, generator, load center, PDU, ATS, and STS

Deliverables

  • Electrical design package per engineering scope
  • Installed distribution and backup power within agreement
  • Inspection records when included in the contract
  • Guidance on durability and failure prevention for the power path

Related services

Data center infrastructure design planning scene

Design Data Center or Server Room systems end to end

Design and renovate Data Center and Server Room systems to international standards. Free consultation on every design approach—with focus on stability, availability, maintainability, safety, investment fit, and future expansion.

FAQ

Why does a Data Center need backup power?

Servers and related equipment run continuously. Without a standards-based backup system that is inspected regularly, a utility outage can stop the room immediately.

What makes a good Server Room electrical system?

A suitable main source, a backup power system, and reliable supply to the equipment.

Can an electrical engineer certify the work?

Yes. Inspection and certification by an electrical engineer are part of the published service list.